Updated as of
|
11/19/2024
|
|
|
|
|
|
|
|
|
|
|
|
Listed below is a summary of the planned outages that could
affect capacity or impact any receipt/delivery locations during the TGC 2024
outage season. This schedule is not a complete list of all outages and is
subject to change as the season progresses to reflect any project delays,
cancellations or additions. Additionally, anticipated impact and
restrictions are subject to change.
*All scheduled dates represent gas days as defined in the TGC Tariff to mean
a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m.
(Central Clock Time).
|
Start Date
|
End Date
|
Location
|
Unit(s)
|
Maintenance
|
Anticipated Impact
|
Meter(s) Impact
|
07/07/2023
|
12/04/2024
|
Upstream of Beeville
|
Integrity Work
|
Pressure Reduction
|
|
10/24/2023
|
07/25/2024
|
Beeville
|
100-1 Line
|
Anomaly Work
|
Pressure Reduction
|
Meters in Beeville Station
to Eagle Plant Segment
|
01/11/2024
|
01/11/2024
|
Kaplan
|
Station
|
Maintenance
|
Higher Daily Line
Pressures and Pressure Fluctuations
|
None
|
02/27/2024
|
02/27/2024
|
Kountze
|
Station
|
Fire and Gas Testing with
ESD
|
All forward haul
nominations that traverse this Kountze station (MP -73.7) will be reduced to
zero.
|
None
|
03/06/2024
|
03/06/2024
|
LA Storage-Delivery
|
Meter Station
|
Meter Tube Inspections and
Replace Transducers
|
Meter will be shut in for
the duration of the outage.
|
93084-LA STORAGE -
DELIVERY
|
05/14/2024
|
05/14/2024
|
Longville
|
200-3 Line
|
Tool Run
|
Pressure Fluctuations
|
None
|
05/16/2024
|
05/16/2024
|
Longville
|
200-3 Line
|
Tool Run
|
Pressure Fluctuations
|
None
|
05/19/2024
|
05/21/2024
|
Kaplan
|
4627
|
Maintenance
|
Higher Daily Line
Pressures and Pressure Fluctuations. Capacity through Kaplan station may
be limited and subject to scheduling reductions.
|
None
|
05/21/2024
|
05/23/2024
|
Kaplan
|
4628
|
Maintenance
|
Higher Daily Line
Pressures and Pressure Fluctuations. Capacity through Kaplan station may
be limited and subject to scheduling reductions.
|
None
|
06/04/2024
|
06/04/2024
|
Bridgeline @Patterson
|
Meter Station
|
Upgrade Power System
|
Meter will be shut in for
the duration of the outage.
|
80578
BRIDGELINE@PATTERSON-BRIDGELINE
|
07/08/2024
|
07/08/2024
|
Kaplan
|
Station
|
Maintenance
|
Higher Daily Line
Pressures and Pressure Fluctuations. Capacity through Kaplan station may
be limited and subject to scheduling reductions.
|
None
|
07/09/2024
|
07/15/2024
|
Longville
|
4522
|
Safeties and Electrical
Inspection
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|
07/11/2024
|
07/12/2024
|
Kountze
|
Station
|
Safeties and Electrical
Inspection
|
All forward haul
nominations that traverse this Kountze station (MP -73.7) will be reduced to
zero.
|
None
|
07/15/2024
|
07/19/2024
|
Beeville
|
100-1 Line
|
Pipe Replacement
|
Meters will be shut in for
the duration of the outage.
|
82751-FINTEX-DCP OPERATING
82604-WOOD RANCH-CHARRO OPERATING
82754-BUTLER-DCP OPERATING
82748-CHRISTMAS LATERAL-DCP OPERATING
80161-TELFERNER FIELD-WEST
82848-KAUP #1-ZACHRY EXPLORATION
82828-MOORE STAFFORD-GAITHER PETROLEUM
80727-EAGLE PLANT INLET-TGC DELIVERY-DCP OPERATING
80165-TERRELL POINT FIELD
81570-TURKEY CREEK-PETROLEUM FUELS
82669-RIVER RANCH INTERCONNECT-CHARRO OPERATING
|
08/12/2024
|
08/12/2024
|
Centerville
|
4721
|
Water Wash
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
08/13/2024
|
08/13/2024
|
Kaplan
|
Station
|
Rewire Transfer Switch
|
Higher Daily Line
Pressures and Pressure Fluctuations. Capacity through Kaplan station may
be limited and subject to scheduling reductions.
|
None
|
08/19/2024
|
08/19/2024
|
Centerville
|
4724
|
Water Wash
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
09/17/2024
|
09/17/2024
|
Centerville
|
4721
|
Maintenance
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
09/19/2024
|
09/19/2024
|
Centerville
|
4724
|
Maintenance
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
09/25/2024
|
09/25/2024
|
Longville
|
4505
|
Maintenance
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|
09/26/2024
|
09/26/2024
|
Longville
|
4506
|
Maintenance
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|
09/27/2024
|
09/27/2024
|
Epps
|
Station
|
Fire and Gas Upgrade
|
Pressure Fluctuations.
Capacity through Epps station may be limited and subject to scheduling
reductions.
|
None
|
10/01/2024
|
10/01/2024
|
Centerville
|
4723
|
Maintenance
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
10/01/2024
|
10/01/2024
|
Kaplan
|
Station
|
Rewire Station Generator
|
Higher Daily Line
Pressures and Pressure Fluctuations. Capacity through Kaplan station may
be limited and subject to scheduling reductions.
|
None
|
10/16/2024
|
10/16/2024
|
Centerville
|
Station
|
Isolation ESD
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
10/23/2024
|
10/23/2024
|
Centerville
|
4725
|
Maintenance
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
10/24/2024
|
10/31/2024
|
Centerville
|
4725
|
Maintenance
|
Pressure Fluctuations.
Capacity through Centerville station may be limited and subject to scheduling
reductions.
|
None
|
10/30/2024
|
10/30/2024
|
Longville
|
4505
|
Maintenance
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|
10/31/2024
|
10/31/2024
|
Longville
|
4506
|
Maintenance
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|
11/12/2024
|
11/12/2024
|
Kaplan
|
Station
|
Station Electrical Work
|
Higher Daily Line
Pressures and Pressure Fluctuations. Capacity through Kaplan station may
be limited and subject to scheduling reductions.
|
None
|
11/26/2024
|
11/26/2024
|
Longville
|
4505
|
Maintenance
|
Capacity through Longville station may be limited and
subject to scheduling reductions.
|
None
|
11/27/2024
|
11/27/2024
|
Longville
|
4506
|
Maintenance
|
Capacity through Longville station may be limited and
subject to scheduling reductions.
|
None
|
12/11/2024
|
12/12/2024
|
Kaplan
|
4627 & 4628
|
Maintenance
|
Higher Daily Line Pressures and Pressure Fluctuations.
Capacity through Kaplan station may be limited and subject to scheduling
reductions.
|
None
|
12/17/2024
|
12/17/2024
|
Longville
|
4509
|
Maintenance
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|
12/18/2024
|
12/18/2024
|
Longville
|
4505
|
Maintenance
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|
12/19/2024
|
12/19/2024
|
Longville
|
4506
|
Maintenance
|
Capacity through Longville
station may be limited and subject to scheduling reductions.
|
None
|