Date Requested: Jan 07 2026 1:18 AM

GR Transactional Reporting Firm

TSP Name: Gulf Run Transmission, LLC (TSP: 118760527)

Print Legend
Downloads:CSV Excel ODS PDF RTF XML
Displaying: rows out of 20 results
Posting Date Posting Time Svc Req K Rate Sch K Begin Date K End Date K Ent Begin Date/Time K Ent End Date/Time K Qty-K Loc / QTI K Stat K Holder K Holder Name Affil Res Rate ID Max Tariff Res Rate Res Rate Charged Com Rate ID Max Tariff Com Rate Com Rate Charged Negotiated Rate Indicator Terms/Notes Rec Loc Rec Loc Ind Rec Loc Zn Rec Loc Name Del Loc Del Loc Ind Del Loc Zn Del Loc Name
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 220015 I Z1 Eastrans DCP Carthage GR 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 220020 I Z1 Midcoast DD to GR 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 220025 I Z1 Marlin Midstream 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 220040 I Z1 EMP Waskom Plant ST-21 GR 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 220050 I Z1 Markwest East TX GR 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 291010 I Z1 Gemini Panola GR 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 822000 I Z1 ETC HPL to GR 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 822040 I Z1 Magnolia Gas - Keatchie 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 822072 I Z1 Regency @ Logansport 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes 822320 I Z1 Enterprise Bulldog 808311 I Z2 Golden Pass Pipeline
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes PL-ALL L Z1 All Pooling Locations PH-ALL L Z2 All Physical Locations
01/01/2026 12:30PM 20001 FTS 07/01/2023 06/30/2043 07/01/2023 09:00AM 07/01/2043 09:00AM 1,100,000 3 A 809644664 Golden Pass LNG Terminal LLC None RES 0.273100 0.215000 COM 0.004200 0.010000 Yes PH-ALL L Z1 All Physical Locations PH-ALL L Z2 All Physical Locations
11/01/2025 12:30PM 20200 FTS 04/01/2023 03/31/2033 04/01/2023 09:00AM 04/01/2033 09:00AM 201,575 3 A 007933062 Trunkline Gas Company, LLC TSP RES 0.273100 0.273100 COM 0.004200 0.004200 Yes Effective Date: Originally, April 1, 2023, as amended and restated April 1, 2024, subject to FERC approval
Primary Term End Date: The end of the Day ten (10) years from the beginning of Period 2
Evergreen/Term Extension? No

MDQ (Dth/D):
150,000 + Applicable Fuel (a) Effective Date through the day before the start of Period 2(b) (“Period 1”)
200,000 + Applicable Fuel (a) From the later of the In-Service Date of the South Louisiana Project or April 1, 2025, provided, however, if the South Louisiana Project is not in service before April 1, 2026, then April 1, 2026, and continuing for a period of ten (10) years (“Period 2”) (b)

Transportation Path:
ETC/HPL to GR (Meter #822000) to Trunkline @ Vinton (Meter # 292545)

Transportation Path Capacity Dth/D:
150,000 + Applicable Fuel(a) - Period 1
200,000 + Applicable Fuel(a) - Period 2

Receipt Entitlement(s) (Dth/D) – Carthage Receipt Area
150,000 + Applicable Fuel (a) - Period 1
200,000 + Applicable Fuel (a) - Period 2

Primary Receipt Point(s): ETC HPL to GR (#822000)
Primary Delivery Point(s): Trunkline @ Vinton (#292545)

Maximum Daily Receipt Obligation*/Maximum Daily Delivery Obligation**:
150,000 Dth/D + Applicable Fuel (a) – Period 1
200,000 Dth/D + Applicable Fuel (a) – Period 2

Negotiated Rate
Reservation Charge: $0.2731
Usage-1 Rate: $0.0042

(a) Applicable Fuel shall be the applicable effective Fuel Reimbursement as stated in Trunkline Gas Company, LLC’s Tariff for Field Zone Only.
(b)The In-Service Date of the South Louisiana Project shall be the first (1st) day of the calendar month following the day on which firm service from primary points of receipt to primary points of delivery is available on Florida Gas Transmission, LLC’s South Louisiana Project.

*The aggregate of all the MDRO’s may not exceed MDQ.
** The aggregate of all the MDDOs may not exceed MDQ.

Authorized Overrun: Unless Transporter agrees otherwise, the rate for any authorized overrun quantities shall be the greater of the maximum Tariff rate or the rate(s) described above or on any designated Attachment.
822000 I Z1 ETC HPL to GR 292545 I Z2 Trunkline @ Vinton
01/01/2026 12:30PM 20560 FTS 01/01/2026 06/30/2028 01/01/2026 09:00AM 07/01/2028 09:00AM 100,000 3 N 074292095 Continental Resources, Inc. None RES 0.104100 0.050000 COM 0.002000 0.002000 No ROFR. In accordance with Section 24 of the GT&C of the Tariff, the parties hereby agree that Shipper shall have a contractual “right of first refusal” (“ROFR”) which will provide to it the same rights and obligations regarding extending service under the Agreement as to reserved capacity on Transporter’s system beyond the termination or expiration date as would be available to Shippers eligible to invoke the provisions of Section 24 of the GT&C of the Tariff, as on file and in effect from time to time.


The Receipt Point(s) eligible for the rates specified herein shall be those listed above (as such Agreement provides on the Effective Date hereof).

The Delivery Point(s) eligible for the rates specified herein shall be those above (as such Agreement provides on the Effective Date hereof). Any scheduled deliveries to the Secondary Delivery Points will be charged the applicable maximum Tariff rate, with the exception of the Secondary Delivery Points listed below, which will be charged the contract rate:
EGT Delhi (Meter No. 291856)
CGT GR (Meter No. 13548)
Sesh 42 Header GR (Meter No. 898400)
Sesh/Sonat Header GR (Meter No. 898501)
GSPL Header GR (Meter No. 3198)
KN-MEP Header GR (Meter No. 3201)
PVG STorage Header GR (Meter No. 822033)
Tenn 800 Header GR (Meter No. 57580)

291856 I Z1 EGT Delhi 13548 I Z1 CGT GR
01/01/2026 12:30PM 20560 FTS 01/01/2026 06/30/2028 01/01/2026 09:00AM 07/01/2028 09:00AM 100,000 3 N 074292095 Continental Resources, Inc. None RES 0.104100 0.050000 COM 0.002000 0.002000 No ROFR. In accordance with Section 24 of the GT&C of the Tariff, the parties hereby agree that Shipper shall have a contractual “right of first refusal” (“ROFR”) which will provide to it the same rights and obligations regarding extending service under the Agreement as to reserved capacity on Transporter’s system beyond the termination or expiration date as would be available to Shippers eligible to invoke the provisions of Section 24 of the GT&C of the Tariff, as on file and in effect from time to time.


The Receipt Point(s) eligible for the rates specified herein shall be those listed above (as such Agreement provides on the Effective Date hereof).

The Delivery Point(s) eligible for the rates specified herein shall be those above (as such Agreement provides on the Effective Date hereof). Any scheduled deliveries to the Secondary Delivery Points will be charged the applicable maximum Tariff rate, with the exception of the Secondary Delivery Points listed below, which will be charged the contract rate:
EGT Delhi (Meter No. 291856)
CGT GR (Meter No. 13548)
Sesh 42 Header GR (Meter No. 898400)
Sesh/Sonat Header GR (Meter No. 898501)
GSPL Header GR (Meter No. 3198)
KN-MEP Header GR (Meter No. 3201)
PVG STorage Header GR (Meter No. 822033)
Tenn 800 Header GR (Meter No. 57580)

291856 I Z1 EGT Delhi 57580 I Z1 Tenn 800 Header GR
01/01/2026 12:30PM 20560 FTS 01/01/2026 06/30/2028 01/01/2026 09:00AM 07/01/2028 09:00AM 100,000 3 N 074292095 Continental Resources, Inc. None RES 0.104100 0.050000 COM 0.002000 0.002000 No ROFR. In accordance with Section 24 of the GT&C of the Tariff, the parties hereby agree that Shipper shall have a contractual “right of first refusal” (“ROFR”) which will provide to it the same rights and obligations regarding extending service under the Agreement as to reserved capacity on Transporter’s system beyond the termination or expiration date as would be available to Shippers eligible to invoke the provisions of Section 24 of the GT&C of the Tariff, as on file and in effect from time to time.


The Receipt Point(s) eligible for the rates specified herein shall be those listed above (as such Agreement provides on the Effective Date hereof).

The Delivery Point(s) eligible for the rates specified herein shall be those above (as such Agreement provides on the Effective Date hereof). Any scheduled deliveries to the Secondary Delivery Points will be charged the applicable maximum Tariff rate, with the exception of the Secondary Delivery Points listed below, which will be charged the contract rate:
EGT Delhi (Meter No. 291856)
CGT GR (Meter No. 13548)
Sesh 42 Header GR (Meter No. 898400)
Sesh/Sonat Header GR (Meter No. 898501)
GSPL Header GR (Meter No. 3198)
KN-MEP Header GR (Meter No. 3201)
PVG STorage Header GR (Meter No. 822033)
Tenn 800 Header GR (Meter No. 57580)

291856 I Z1 EGT Delhi CLR LOC L Z1 CLR LOC
01/01/2026 12:30PM 20560 FTS 01/01/2026 06/30/2028 01/01/2026 09:00AM 07/01/2028 09:00AM 100,000 3 N 074292095 Continental Resources, Inc. None RES 0.104100 0.104100 COM 0.002000 0.002000 No ROFR. In accordance with Section 24 of the GT&C of the Tariff, the parties hereby agree that Shipper shall have a contractual “right of first refusal” (“ROFR”) which will provide to it the same rights and obligations regarding extending service under the Agreement as to reserved capacity on Transporter’s system beyond the termination or expiration date as would be available to Shippers eligible to invoke the provisions of Section 24 of the GT&C of the Tariff, as on file and in effect from time to time.


The Receipt Point(s) eligible for the rates specified herein shall be those listed above (as such Agreement provides on the Effective Date hereof).

The Delivery Point(s) eligible for the rates specified herein shall be those above (as such Agreement provides on the Effective Date hereof). Any scheduled deliveries to the Secondary Delivery Points will be charged the applicable maximum Tariff rate, with the exception of the Secondary Delivery Points listed below, which will be charged the contract rate:
EGT Delhi (Meter No. 291856)
CGT GR (Meter No. 13548)
Sesh 42 Header GR (Meter No. 898400)
Sesh/Sonat Header GR (Meter No. 898501)
GSPL Header GR (Meter No. 3198)
KN-MEP Header GR (Meter No. 3201)
PVG STorage Header GR (Meter No. 822033)
Tenn 800 Header GR (Meter No. 57580)

291856 I Z1 EGT Delhi PH-D-Z1 L Z1 PH-D-Z1
12/01/2025 12:30PM 20667 FTS 12/01/2025 02/28/2026 12/01/2025 09:00AM 03/01/2026 09:00AM 16,000 3 N 612075846 Sequent Energy Management LLC None RES 0.104100 0.085000 COM 0.002000 9999.000000 No 822033 I Z1 PVG Storage Header GR 898400 I Z1 Sesh 42 Header GR
12/01/2025 12:30PM 20667 FTS 12/01/2025 02/28/2026 12/01/2025 09:00AM 03/01/2026 09:00AM 16,000 3 N 612075846 Sequent Energy Management LLC None RES 0.104100 0.085000 COM 0.002000 9999.000000 No 822090 I Z1 Arcadia GR 898400 I Z1 Sesh 42 Header GR
01/01/2026 12:30PM 20677 FTS 01/01/2026 01/31/2026 01/01/2026 09:00AM 02/01/2026 09:00AM 10,000 3 N 118638852 Castleton Commodities Merchant Trading L.P. None RES 0.104100 0.104100 COM 0.002000 0.002000 No 822062 I Z1 Clear Lake GR 898501 I Z1 Sesh/Sonat Header GR